WHERE ARE WE TODAY
·
All
sections are complete from an operational perspective. Specifically, all mainlines are running with
ever reduced crashes as I keep tweaking.
·
The
circuits for automated operation are installed and running. So essentially the layout can run without
intervention until something derails.
·
Most
lesser engines have a live second engine to get a train past dirty spots on
tracks.
·
All
buildings are complete and many are customized for better detail.
·
The
layout is populated with vehicles and people.
·
All
tunnel portals are installed as are mountain skeletal structures.
·
Some
animation is installed and running – mostly cranes.
·
Most
overhead animation is installed and operational.
·
All
engines, trollies and rolling stock is installed and running.
·
All
vertical rock walls composed of decomposed granite or other pebble material are
made and installed, although some touch up is needed.
·
All
electronics control panels are complete.
·
All
open freight cars have loads.
WHAT NEXT
Work
on the railroad never ends. People ask
when will it be done. The answer is
simple – NEVER!
Following
are all the major projects that I have identified to date. However, I am always finding new things. Although, there will be no new sections.
Animation
·
Run
power to remaining cranes.
·
Install
small ground animations such as working backhoes, kite flyers, etc.
·
Add
a few more overhead animations.
·
Hook
power to automated crossing signals and blinking street signs.
Sound
·
Research
and ID small electronic recording devices and compatible speakers.
·
Install
sound at passenger stations and other key locations.
·
Install
trigger mechanism using reed switch and MK111 timers to control on and off.
Lighting
·
Install
lighting for all structures.
Structures
·
Add
conveyors in Steel and other areas.
·
Make
large elevated pipeline into refinery.
·
Refine
details of steel mill.
·
Install
smoke in smoke stacks.
Ground cover
·
Continue
installing grass in selected areas.
·
Install
ballast in all ground level track – not elevated.
Building
refinements
·
Age
and weather older models.
·
Install
motor on older models.
Rolling stock
refinements
·
Weather
rolling stock.
·
Install
more grab irons.
Other
·
Fencing
on elevated rail sections.
·
Build
overhead wires for electric train pickups.
Mountains
·
Apply
hard shell casting material.
·
Apply
plaster.
·
Apply
plaster and stain.
·
Make
rock castings, stain and apply to mountain sides and surfaces.
·
Apply
grasses to mountains.
·
Install
trees on mountain sides.
·
Install
trees and stumps to logging areas.
Water bodies -
ponds, lakes and harbor
Cut
out, plaster, paint, seal and apply resin.
Waterfalls
Plaster,
paint, seal and apply resin.
Tweaking
NEVER
ENDING!!!